|
1- Production and Facilities Engineering
-
Well
completion
-
Well
performance evaluation and optimization
-
Well
test analysis
-
Artificial lift design, evaluation, and optimization
-
Feasibility studies and property economic evaluation
-
Conceptual design of production facilities
-
Review
and evaluation of existing systems
-
Preparation
and updating of
operating manuals
2- Well Testing
Field-testing of flowing and transient BHP and dynamometer testing
of rod pumping wells. This newly developed technology uses
electronic acoustic equipment, which eliminates the need for running
BHP gauges.
Tests Description:
Equipment Description
3- Training
-
Petroleum engineering training
-
Field
production operations training
-
Preparation of tailored training manuals
4- Local Support to International Companies
-
IHS
Energy, PSG Group, Houston USA
(Engineering
consulting and Production Engineering Software)
-
Power
Flow International, Houston USA(Oil
field equipment international sales and services)
-
Production Associates, Houston USA(Production Engineering and
Gas lift)
5- Manpower Support services
|
|