|
CLIENT |
DATE |
PROJECT |
|
|
Agiba Petroleum
Company |
Nov. 87 Feb. 89 |
Technical and
project management assistance for the water injection and the
facilities expansion projects in Meleiha fields |
| |
Geisum Oil Company |
Nov. 88 Jan 89 |
Pre-study
evaluations and preparation of scope of work for reservoir and
field development optimization study, South Geisum Field |
| |
Suez Oil Company |
Feb. 89 April 89 |
Review and
optimization of Ras Budran gas lift system and facilities
comprising 18 gas lifted wells and 27 mmscf/d gas compression
and distribution system |
| |
Western Desert
Operating Petroleum Company |
July 89 Nov. 89 |
Evaluation and tie
in feasibility/conceptual design for the development of North
Abu Qir East Lobe Gas Field, Well
N A/Q PH II # 1 |
| |
Alamein Petroleum
Company
|
Jan 90 April 91 |
Geological and
engineering evaluations of the Horus field,
analysis/optimization of wells production and supervision of
implementation programs |
| |
Geisum Oil Company |
June 91- Dec. 92 |
Evaluation of well
G-16 productivity and conceptual design of offshore structure
and topside facilities
(in association
with Zentech Inc. of Houston USA) |
| |
Western Desert
Operating Petroleum Company |
Dec. 92 Jan. 93 |
Engineering
evaluation of D-3 zone and determining the feasibility of
additional development well |
| |
Suez Oil Company
|
May 92 - Oct. 92 |
Ras Budran gas
lift system, review and optimization |
| |
Alamein Petroleum
Company |
May 92 July 92 |
Optimization and
redesign of rod pumping system in Horus field |
|
|
Geisum Oil Company |
April 93 - June 93 |
Production scheme
evaluation and project definition,
S. Geisum field |
| |
Agiba Petroleum
Company |
May 94 - July 94 |
Evaluation of
artificial lift options and conceptual design of Rod and Jet
pumping systems, Zarif field |
| |
Agiba Petroleum
Company |
Oct. 94 |
Water injection
system engineering and basic design, Zarif field
|
| |
Suez Oil Company |
Sep. 95 - Feb. 96 |
Production system
model updating review and optimization, Zeit Bay field |
| |
Agiba Petroleum
Company |
May 96 - Aug. 96 |
Engineering
evaluation and artificial lift study and design of Rod pumping
system El Faras field |
| |
Geisum Oil Company |
Oct. 96 |
Geisum production
system simulation |
| |
Qarun Petroleum
Company |
Sep. 97 |
Design of Sucker
Rod pump system, Well WR 1 |
| |
Geisum Oil Company |
May 96 |
Hydraulic jet
pumping evaluation South Geisum field |
| |
Geisum Oil Company |
Oct. 97 |
Trouble shooting
of Jet pumping failure in wells GD-5 and GD-6 |
| |
General Petroleum
Company |
June 97 July 97 |
Review and
re-design of 140 Rod Pumping wells, Western Desert and Eastern
Desert Fields |